Validation Survey ' hit the ground running '
Taking on the maintenance contract for a large Mitsubishi City Multi installation can be a big stab in the dark. Maintenance records, schematic diagrams, as installed drawings, O&M manuals, commissioning data all too often get misplaced along the way. Air conditioning systems are replaced or modified.
It can often take a new maintenance engineer a number of days just to locate & identify the address & group orientation of the units on a large site if no detailed records have been left or handed over.
Without detailed information about the system layout & set up troubleshooting becomes an unnecessary time consuming process.
A validation survey can be used to confirm exactly what equipment is on site, how it is set up & if it is currently working. Identify the correct refrigerant charge for each system for the F gas record log.
The survey report can include a basic health check report which can be used to identify what maintenance repair work will be required immediately & can therefore be used to help estimate initial maintenance costs. Refrigerant Leakage Survey ' measure twice cut once '
Mitsubishi Electric City Multi systems are subject to the F Gas Regulations. Typically a 10% loss of refrigerant charge can result in a 20% increase in electrical power consumption.
By using advanced monitoring techniques Tim can provide a detailed data report to confirm if the systems are operating with an appropriate refrigerant charge & identify any system which is operating with any refrigerant under charge.
If the refrigerant charge information is nolonger available from the original installation, Tim can accurately calculate the system refrigerant charge for each system required by the F gas record log.